Investigation into Discrepancies in Alignment and Levelling of Precast Segmental Box Girders (SBGs) During Launching for LRT 3, from Bandar Utama to Johan Setia (Package GS10)

Authors

  • Nurul Afiqah Mohd Idris Universiti Tun Hussein Onn Malaysia
  • Reventheran Ganasan Universiti Tun Hussein Onn Malaysia
  • Akmal Hakim Ismail AlKauthar Kinematics Sdn Bhd
  • Mustapha Kamil Omran Universiti Tun Hussein Onn Malaysia
  • Zuraidah Ngadiron Universiti Tun Hussein Onn Malaysia
  • Ramesh Nayaka Indian Institute of Technology (IIT) Dharwad
  • Md Akter Hosen Dhofar University

Keywords:

Precast concrete, As-Built Survey, Segmental Box Girder, LRT3

Abstract

In recent decades, there has been a notable global increase in the utilization of precast concrete segmental bridges within construction projects. However, discrepancies have been observed in the height of precast Segmental Box Girders (SBGs) installed alongside PS1 (monolithic), deviating from project specifications. This discrepancy impacts the deck level and consequently influences the Top of Rail (TOR). Consequently, a study was undertaken at AlKauthar Kinematics Sdn Bhd, a company involved in the LRT3 project's construction, with a specific focus on the casting and installation of Segmental Box Girders. The study's objectives include identifying the factors contributing to precast SBG misalignment during the LRT3 project's launch at P25-08, analyzing data for realignment purposes, and proposing design methodologies for manufacturing SBGs. The methodology employed in this study entails the analysis of data sourced from the industry, utilizing As-Built Surveys conducted by surveyors. Findings indicate that precast SBG misalignment during launching at P25-08 is primarily attributed to on-site errors, particularly casting errors during the construction of the cast-in-situ monolithic segment P25-08. This insight is invaluable for both governmental bodies and private construction organizations in mitigating project setbacks.

Author Biographies

  • Mustapha Kamil Omran, Universiti Tun Hussein Onn Malaysia
    FELO INDUSTRI Jabatan Teknologi Kejuruteraan Pengangkutan Fakulti Teknologi Kejuruteraan
  • Zuraidah Ngadiron, Universiti Tun Hussein Onn Malaysia
    PENSYARAH KANAN Jabatan Teknologi Kejuruteraan Pengangkutan Fakulti Teknologi Kejuruteraan
  • Ramesh Nayaka, Indian Institute of Technology (IIT) Dharwad

    Assistant Professor

    Department of Civil and Infrastructure Engineering

  • Md Akter Hosen, Dhofar University

    Assistant Professor
    Department of Civil and Environmental Engineering

Downloads

Published

20-06-2024

Issue

Section

Articles

How to Cite

Mohd Idris, N. A., Ganasan, R., Ismail, A. H., Omran, M. K., Ngadiron, Z., Nayaka, R. ., & Hosen, M. A. . (2024). Investigation into Discrepancies in Alignment and Levelling of Precast Segmental Box Girders (SBGs) During Launching for LRT 3, from Bandar Utama to Johan Setia (Package GS10). Journal of Advanced Industrial Technology and Application, 5(1), 1-10. https://publisher.uthm.edu.my/ojs/index.php/jaita/article/view/17172