Factors Affecting Quality in Construction Project Life Cycle (CPLC)

Authors

  • Siti Khalijah Yaman Sustainable Construction Management, Jamilus Research Centre, Faculty of Civil and Environmental Engineering, Universiti Tun Hussein Onn, MALAYSIA http://orcid.org/0000-0003-0519-4361
  • Padzil@Fadzil Hassan Faculty of Architecture, Planning and Surveying, Universiti Teknologi MARA, Shah Alam, Selangor, 40450, MALAYSIA
  • Nur Maisarah Yusop Jamilus Research Centre, Faculty of Civil Engineering and Built Environment, Universiti Tun Hussein Onn Malaysia, Parit Raja, Batu Pahat, Johor, 86400, MALAYSIA
  • Nur E’zzati Hashim Jamilus Research Centre, Faculty of Civil Engineering and Built Environment, Universiti Tun Hussein Onn Malaysia, Parit Raja, Batu Pahat, Johor, 86400, MALAYSIA
  • Hairuddin Mohammad Centre for Diploma Studies,Universiti Tun Hussein Onn Malaysia, Pagoh Higher Education Hub, Pagoh, Johor, 84600,MALAYSIA
  • Hasniza Abu Bakar Jamilus Research Centre, Faculty of Civil Engineering and Built Environment, Universiti Tun Hussein Onn Malaysia, Parit Raja, Batu Pahat, Johor, 86400, MALAYSIA

Keywords:

Quality, construction project life cycle, construction project

Abstract

Quality is among the critical element in managing a construction project. Unfortunately, according to several established documents, issues related to quality in the Malaysian construction project are still rampant. Therefore, to delve deeper into the predicament, understanding the factors affecting construction quality was deemed essential. This even more vital given the minimal number of manuscripts looking into the matter accordingly with the generic construction project life cycle (CPLC). Thus, to operationalise the initial research, a mixed methodology endeavour was selected. This by carrying out a Multi-layered Thematic Analysis (MLTA) to determine factors affecting the quality in the CPLC and questionnaire survey to validate each factor's agreement. Through the MLTA, the results show several similarities in factors, especially in the off-site phases. Whereby in the on-site phases, factors related to 4 M's (money, material, manpower, and machinery) were found to be common. Then, through the questionnaire survey, each factor's mean and median values indicate that the majority of respondents were agreed (scale of 4 to 5) with the dedicated phase of each factor. To sum up, there is evidence that different CPLC has different factors affecting construction quality. In the current form, the findings are valuable as a basis for subsequent research undertaking, e.g. focusing on the micro perspective of quality within each phase and parties involved in the construction project.

Downloads

Download data is not yet available.

Downloads

Published

07-03-2022

Issue

Section

Articles

How to Cite

Yaman, S. K., Hassan, P. ., Yusop, N. M., Hashim, N. E., Mohammad, H. ., & Abu Bakar, H. . (2022). Factors Affecting Quality in Construction Project Life Cycle (CPLC). International Journal of Integrated Engineering, 14(1), 322-335. https://publisher.uthm.edu.my/ojs/index.php/ijie/article/view/8072