binti Mat Zahari, Nur Intan Amira, and Ts. Dr. Joewono Prasetijo. “Maintenance Study of Rail Track Structure for Temporary Track at Electrified Double Track Project (EDTP) Gemas-JB”. Progress in Engineering Application and Technology, vol. 3, no. 2, Dec. 2022, pp. 774–782, https://publisher.uthm.edu.my/periodicals/index.php/peat/article/view/7929.