[1]
A. Kassim and A. Sarman, “Optimising The Implementation of Building Information Modelling in 4D (Scheduling) and 5D (Cost) for Highway and Bridge Construction”, IJIE, vol. 17, no. 3, pp. 172–183, Sep. 2025, Accessed: Apr. 08, 2026. [Online]. Available: https://publisher.uthm.edu.my/ojs/index.php/ijie/article/view/17887