Abdullah, M., Abdul Azis, A. and Abdul Rahman, I. (2009) “Potential Effects on Large Mara Construction Projects Due To Construction Delay”, International Journal of Integrated Engineering, 1(2). Available at: https://publisher.uthm.edu.my/ojs/index.php/ijie/article/view/88 (Accessed: 18 July 2024).