Kassim, AG.S.A.AG, and A.M. Sarman. 2025. “Optimising The Implementation of Building Information Modelling in 4D (Scheduling) and 5D (Cost) for Highway and Bridge Construction”. Translated by E.M. Mazlan, J. Manggi, and Y.M. Chin. International Journal of Integrated Engineering 17 (3): 172-83. https://publisher.uthm.edu.my/ojs/index.php/ijie/article/view/17887.